1.Arranged cribbing on piles at open yard before loading.
2.Measurement for arranged cribbing.
3.View of cribbing arranged on piles at open yard.
4.View of vessel alongside at YZCK terminal.
5.Loading operation is in progress in LH No.2.
6.Loading operation is in progress in LH No.2.
7.Have finished bottom tier loading in LH No.2.
8.Loading operation is in progress on TD No.2.
9.
9.View of bottom stowage on TD No.2.
10.View stowage and lashing condition on HC.
11.Vessel sailing from Taicang YZCK terminal.
|