1.Prepared rigging for nacelles.
2.Loading in progress with nacelle by ship’s crane.
3.Hooking on hubs by shore crane.
4.Hub loading in LH No.2 by shore crane.
5.Blade loaded by two shore crane in tandem ops by stevedores.
6.Bird view.
7.View of lashing and welding condition with root end. |